Concrete Calculator Online
Ordering concrete is a guess until the volume is right — too little and the pour stops halfway, too much and you pay for a truckload you cannot use. This concrete calculator online works out cubic yards, cubic metres, and bag counts for slabs, footings, and round columns, with a 10% waste option built in.
Recommended for most jobs — uneven ground and formwork use more concrete than the maths says. The volumes and bag counts include the extra when this is ticked.
Volume — cubic yards
—
Volume — cubic metres
—
Volume — cubic feet
—
60 lb bags (0.45 cu ft each)
—
80 lb bags (0.6 cu ft each)
—
Waste added
—
Pick a shape and units, enter the dimensions, then click Calculate. Nothing is uploaded.
Why Use This Concrete Calculator Online?
Concrete is sold by volume, and the volume of a slab is easy to get wrong. Length times width times depth sounds simple, but the depth is usually in inches while the length and width are in feet, and mixing the units up is the classic mistake — a 4-inch depth entered as 4 feet gives twelve times too much concrete. A concrete calculator online keeps the units straight and gives the volume in cubic yards, cubic metres, and cubic feet at once.
It also settles the bags-versus-truck question. Small jobs are cheaper in bags, but nobody wants to guess how many — and a part bag has to be bought, so the count has to round up. This concrete calculator online shows both bag sizes, 60 lb and 80 lb, and the 10% waste toggle adds the extra that spillage and uneven ground take.
Privacy matters here too: this concrete calculator online runs entirely in your browser, so the figures you type never leave your device. There is no account, no sign-in, and nothing to upload. It sits in our Calculators collection for every small building question, from a patio slab to a fence post footing.
How to Use This Concrete Calculator Online in 4 Steps
- Pick the shape. Slab for a flat area like a patio or shed base, footing for a buried strip or pad under a wall or post, and round column for a tube or pier. The slab and footing use the same maths, so pick the tab that matches your job.
- Pick the units. Imperial takes feet and inches: length and width in feet, depth or diameter in inches, column height in feet. Metric takes metres for every dimension.
- Enter the dimensions and tick the waste box if you want it. The 10% waste allowance is the usual rule for real ground, and it adds 10% to the volume and the bag counts.
- Click Calculate. This concrete calculator online shows the volume in cubic yards, cubic metres, and cubic feet, plus both bag counts and the waste added, straight away.
Concrete Calculator Online: How the Volume and Bag Counts Are Worked Out
The volume of a slab or footing is length times width times depth, all in the same unit. In imperial units the depth in inches is divided by 12 first, so a 4-inch depth counts as a third of a foot, and the result is in cubic feet — divide by 27 for cubic yards, or multiply by 0.0283 for cubic metres. A round column uses the area of a circle instead: pi times the radius squared, times the height. Bag counts come from the cubic feet: a 60 lb bag covers 0.45 cubic feet and an 80 lb bag covers 0.6, and the count is always rounded up, because a part bag still has to be bought whole.
A worked example makes it concrete. Take a slab 10 ft long, 10 ft wide, and 4 inches deep: the area is 100 square feet and the depth is a third of a foot, so the volume is 33.33 cubic feet, which is 1.23 cubic yards or 0.94 cubic metres. With the 10% waste allowance the order becomes 1.36 cubic yards. In bags, the same slab needs 75 bags at 60 lb or 56 at 80 lb — 82 or 62 with waste. A round column 12 inches across and 4 ft high is smaller: the radius is half a foot, so the volume is pi times 0.25 times 4, which is 3.14 cubic feet, or 0.12 cubic yards — 7 bags at 60 lb or 6 at 80 lb. In metric, a slab 3 m by 3 m and 0.1 m deep is 0.9 cubic metres, which is 1.18 cubic yards or 31.78 cubic feet, needing 71 bags at 60 lb or 53 at 80 lb. This concrete calculator online works out all three shapes in both unit systems. For the background on what concrete is and how it sets, see the concrete article on Wikipedia.
One cubic yard is 27 cubic feet, which is why a volume in cubic feet divided by 27 gives the yards a ready-mix supplier quotes in. One cubic metre is about 35.31 cubic feet, or 1.31 cubic yards. The waste allowance multiplies the volume by 1.1 before the bags are counted, so the extra shows up in every figure, and the waste-added box shows how much was included.
Concrete Calculator Online vs Other Ways to Work Out Concrete
| Method | Gives yards and metres | Counts bags | Adds waste | Best for |
|---|---|---|---|---|
| This concrete calculator online | Yes | Yes, both sizes | Yes, 10% | An order figure in a minute |
| A phone calculator | If you convert | If you divide | If you remember | One simple slab |
| The supplier's estimate | Yes | No | Sometimes | The final order |
| Guessing | No | No | No | Nothing — a short pour stops the job |
For an order figure you want right now, with the units converted and the bags counted, this concrete calculator online is the simplest choice.
Everyday Scenarios for This Concrete Calculator Online
Pouring a patio slab with this concrete calculator online
A patio 10 ft by 10 ft and 4 inches deep needs 1.23 cubic yards — 1.36 with the waste allowance — which is 75 bags at 60 lb or 56 at 80 lb. That is a lot of bags to mix by hand, so the figures also tell you when a ready-mix truck is the cheaper option.
Setting fence post footings with this concrete calculator online
Each post needs a round footing 12 inches across and 4 ft deep: 3.14 cubic feet, or 7 bags at 60 lb per post. Multiply by the number of posts and the total is exact, instead of a guess that runs short halfway down the fence.
Ordering in metric for a shed base with this concrete calculator online
A shed base 3 m by 3 m and 0.1 m deep is 0.9 cubic metres, or 1.18 cubic yards — so the supplier who quotes in yards and the one who quotes in metres can be compared on equal terms.
Common Mistakes When Using a Concrete Calculator Online
The biggest mistake is mixing up the units on the depth. A slab 10 ft by 10 ft and 4 inches deep is 33.33 cubic feet — but enter that 4 as feet instead of inches and the answer comes out twelve times too big, at 400 cubic feet. The imperial tab takes the depth in inches for exactly this reason, so check the label on the depth box before trusting the result.
The second mistake is ordering exactly the calculated volume with no waste allowance. Real ground is never level, formwork bows out, and some concrete always spills — which is why the 10% toggle exists. The other slip is rounding the bag count down: a job needing 74.1 bags needs 75, because the shop does not sell a tenth of a bag.
Concrete Calculator Online: Frequently Asked Questions
Multiply the length by the width by the depth, all in the same unit, to get the volume. A 10 ft by 10 ft slab 4 inches deep is 33.33 cubic feet, which is 1.23 cubic yards — and this concrete calculator online works that out for any slab size.
Yes, in most jobs. Spillage, uneven ground, and formwork that bows out all use more concrete than the maths says, so ordering 10% extra is the usual rule. The waste toggle adds 10% to the volume and bag counts, and shows how much extra that is.
Divide the volume in cubic feet by the bag size: a 60 lb bag covers 0.45 cubic feet and an 80 lb bag covers 0.6, and the count is always rounded up, because a part bag still has to be bought.
A slab is a flat area of concrete, like a patio or a shed base, while a footing is the buried strip or pad that carries the weight of a wall or a post. The maths is the same — length times width times depth — so this calculator offers both as separate tabs.
No. This concrete calculator online runs entirely in your browser. The figures you type are used only on your own device and are never uploaded, stored, or sent to a server.
In short, this concrete calculator online is the fast, private way to order the right amount — enter the dimensions, add waste, and take the figures to the supplier.